A quiet residential street with a new ADU behind one of the homes
Lakeland Village, CA

ADU Company in Lakeland Village - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansOur technicians have up to 16 years of experience
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A small deck outside a new ADU
The living room inside a new ADU
A new two-story ADU over a garage
A compact kitchen inside a new ADU
A new modern ADU with wood cladding
An attached garage converted into living space
A new sunroom addition with three walls of windows
A kitchenette inside a converted garage
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

ADU Company in Lakeland Village, CA

Lakeland Village is an unincorporated pocket of Riverside County where ADU projects run on a different set of rules than most of Southern California. There’s no city hall pulling permits here. Every accessory dwelling unit, garage conversion, and home addition routes through Riverside County Land Use Services, and a large share of parcels run on private septic systems rather than municipal sewer. That septic piece alone changes how we plan, price, and schedule ADU work in Lakeland Village. If you’re weighing an ADU on your lot, call Lodgewick ADU Builders at (254) 602-5618 and we’ll walk you through what your specific property actually needs.

Call (254) 602-5618

Why Lakeland Village Homes Are Different

The bedroom inside a new ADU

Most of the single-family homes in Lakeland Village were built between the 1970s and 1990s, and many sit on semi-rural lots larger than a typical suburban subdivision. That lot size works in your favor under California’s state ADU law, which allows a detached ADU up to 800 square feet on nearly any residentially zoned parcel. But the older housing stock comes with realities we plan for from day one: 100-amp electrical panels that need upgrading before county sign-off, slab or pier-and-beam foundations from that era, and septic systems that don’t always have capacity for another dwelling.

The Elsinore Valley climate shapes ADU design here too. Summer highs routinely cross 100°F, and the lake’s humidity pushes cooling loads higher than surrounding Inland valleys. Title 24 energy compliance isn’t a formality on these projects, it’s the difference between an ADU that’s comfortable in August and one that isn’t. Lower-elevation parcels nearest the lake also deserve a FEMA flood zone check before foundation design is finalized. We’ve seen county site plan reviews hinge on that detail.

Our Main Lakeland Village Services

Lakeland Village homeowners typically come to us for three things: adding square footage to the existing house, converting a garage into living space, or building a detached ADU in the yard. Each has its own page below with local pricing and specifics.

Home Addition Contractor in Lakeland Village

A home addition on a 1970s or 1980s Lakeland Village house usually means opening walls on a structure that wasn’t framed with today’s seismic standards. We plan for structural tie-ins, electrical panel capacity, and county inspection sequencing before the first wall comes down. On lots with septic systems, a habitable-space addition can also trigger a septic capacity review, which is a hidden timeline item many contractors miss. If you’re thinking about adding a bedroom, bath, or family room, Home Addition Contractor in Lakeland Village covers what it costs and how it’s permitted here.

Home Addition Contractor in Lakeland Village

Garage Conversion Contractor in Lakeland Village

Garage conversions in Lakeland Village are often the fastest path to livable square footage, and on these semi-rural lots the garage is frequently detached, which opens up design flexibility. The catch points are the same ones that bite on ADUs: a 100-amp panel that can’t carry the new load, a slab floor that needs leveling before framing, and county septic setback rules if a bathroom is involved. We write all of that into the price before work starts. See Garage Conversion Contractor in Lakeland Village for local ranges and timelines.

Garage Conversion Contractor in Lakeland Village

ADU Builders in Lakeland Village

Detached ADUs are where the Lakeland Village septic rule hits hardest. Riverside County inspectors enforce setback distances between a new ADU and existing septic tanks, leach fields, and future expansion areas. A site plan that doesn’t account for those distances fails review outright, and we’ve seen out-of-area contractors caught flat by it. We evaluate septic capacity and setback compliance before we ever quote a foundation. For a full breakdown of what a backyard ADU costs in Lakeland Village, visit ADU Builders in Lakeland Village.

ADU Builders in Lakeland Village
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (254) 602-5618

Brands We Service in Lakeland Village

We work hands-on with prefab and panelized ADU systems from Abodu, Cover, and Dvele, plus James Hardie siding where the design calls for it. Because county plan check in Lakeland Village moves slower than city jurisdictions, we order brand components early so material lead times don’t stack on top of permit wait times. See our brands for what we’re able to install and service here.

Pricing for ADU Company in Lakeland Village, CA

Service Typical range in Lakeland Village
Detached ADU (400 – 800 sq ft) $180,000 – $320,000
Garage conversion ADU (attached) $120,000 – $210,000
Garage conversion ADU (detached) $145,000 – $260,000
Junior ADU (JADU, up to 500 sq ft) $85,000 – $150,000
Home addition (bedroom + bath) $110,000 – $185,000
Home addition (family room) $90,000 – $160,000
Electrical panel upgrade (100-amp to 200-amp) $3,500 – $6,500
Septic capacity evaluation and system expansion $5,000 – $20,000+
Foundation repair or leveling before conversion $4,000 – $12,000
Title 24 energy compliance upgrades $2,000 – $7,000

In Lakeland Village, the two biggest swing factors on price are septic system work and electrical panel upgrades. A lot with a healthy septic system and a modern panel lands at the low end of these ranges; a lot that needs a new leach field or a 200-amp service lands at the high end. Either way, you get a written price before any work starts, and that number doesn’t change at the door. Call (254) 602-5618 for a free estimate on your specific property.

Neighborhoods We Serve in Lakeland Village

We work across the entire Lakeland Village CDP, from the lake-adjacent parcels where flood zone reviews matter most, to the hillside and semi-rural lots further from the shoreline. The local pros reach every corner of Lakeland Village from the Inland Empire office, usually with a first visit scheduled within a week of your call.

  • Lake Elsinore shoreline parcels (lower elevation, flood-zone attention needed)
  • Grand Avenue corridor
  • Lakeside Drive area
  • North Lakeland Village (toward the hills)
  • South Lakeland Village (near the county line)

Service Area – Cities Near Lakeland Village

While Lakeland Village is our focus, the local pros also handle ADU and home addition work in nearby cities. We regularly serve homeowners in Los Angeles, CA, Long Beach, CA, Anaheim, CA, and Riverside, CA, with the same written-price-first approach we bring to every Lakeland Village job.

Serving Lakeland Village, CA - Our Local Coverage Area

We’re serving the Lakeland Village area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs About ADU Company in Lakeland Village

The bathroom inside a new ADU

Ready to get started? Free estimates in Lakeland Village
Call (254) 602-5618

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Lakeland Village Customers Say

★★★★★ 5.0 from 7+ reviews

"I was nervous about adding on but they walked me through every step and every cost before we started. No surprise change orders halfway through like I'd heard horror stories about."

- Eleanor Pratt

"Junior ADU conversion inside the house. They protected the rest of our place with plastic and daily cleanup. Done nearly on schedule and on the number they quoted."

- Sabrina Veld

"Garage conversion into an office and guest room. Fair written price, finished close to on schedule, and they fixed a small drywall crack under warranty months later without any hassle."

- Diana Cho

How It Works in Lakeland Village

Getting your ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

More ADU services in Lakeland Village

Every build below starts the same way: a free site visit and a written price.

Getting started with Lodgewick

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Find your local team

Each location is independently owned and works to the same written standard. Enter your ZIP code to reach yours.

A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Mar 31, 2027
Always

Written Price Before Any Work Starts

Expires Mar 31, 2027
Included

Written Guarantee on Every Repair

Expires Mar 31, 2027
Free

Free Second Visit if the Repair Fails

Expires Mar 31, 2027

Request a Free Estimate

Tell us what's going on in Lakeland Village. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch
Areas We Serve
Call Now - 24/7 Dispatch