A new modern detached ADU in a backyard
ADU Builders · Marina del Rey, CA

ADU Builders in Marina del Rey - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansOur technicians have up to 16 years of experience
A compact kitchen inside a new ADU
A new modern ADU with wood cladding
The bedroom inside a new ADU
The bathroom inside a new ADU
A small deck outside a new ADU
A bedroom and desk inside a converted garage
A single-story rear room addition with tall windows and a new patio
An attached garage converted into living space
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable ADU Builders Across Marina del Rey

Building an ADU in Marina del Rey means navigating two sets of rules at once: unincorporated LA County permitting and California Coastal Zone review. That dual review doesn’t exist a mile east in Culver City or Mar Vista, and it changes everything about cost, timeline, and what actually gets approved. You need a builder who has worked through both layers and can tell you, in writing, what your project will really cost before you commit. That’s what we do. Lodgewick ADU Builders serves Marina del Rey homeowners with straight pricing, written guarantees, and crews who understand fill soil, marine air, and county plan checkers. Call (254) 602-5618 for a free estimate. You’ll get a real number, not a guess.

Call (254) 602-5618

Key Takeaways

  • Marina del Rey ADUs require LA County Department of Regional Planning review, plus a Coastal Development Permit when the county determines one applies.
  • Detached ADU foundations here typically need a site-specific geotechnical report due to the area’s liquefaction-hazard designation, adding $5,000 – $15,000 in soft costs.
  • Marine-layer corrosion means specifying stainless or hot-dip galvanized hardware from day one, not after a bid gets blown open.
  • Most Marina del Rey housing stock is condo or garden-apartment, so JADUs and garage conversions on the rare single-family parcels dominate our local work.

Why Lodgewick ADU Builders Is Marina del Rey’s Preferred ADU Company

A new two-story ADU over a garage

Homeowners here have told us the same story enough times that we’ve built our process around it: a quote that looked reasonable in the spring became unmanageable by fall because nobody flagged the geotech requirement, the coastal corrosion spec, or the county’s code triggers. We don’t do that. Before we write a number, we walk the parcel, check the fill-soil implications, and account for the marine layer in the materials list. Then we hand you a written price and a written guarantee under The Kingswell Guarantee.

Our reputation in Marina del Rey comes from doing what we say: a live person answers when you call, the crew arrives in the window we give, and the job site stays clean. If work doesn’t hold up within 365 days, we come back and fix it. That’s the Done Right Promise, in writing, on every build.

ADU Plans in Marina del Rey

ADU Plans in Marina del Rey carry weight inland contractors don’t anticipate. Because the community is unincorporated Los Angeles County with a Coastal Zone overlay, a plan set that clears in Culver City can stall here for coastal review or a geotech addendum. We prepare Marina del Rey homeowners for this before drawings begin. A full plan set for a detached ADU here typically runs $8,000 – $18,000, depending on whether a Coastal Development Permit is triggered and whether the county requires structural engineering above the geotech baseline. For a JADU conversion inside an existing structure, plans generally fall between $3,500 – $7,500.

We don’t treat plans as a standalone profit center. They’re the front end of a build we intend to complete, which means we draw with the county plan checker’s questions already answered: fill-soil foundation notes, marine-grade fastener schedules, and coastal-zone setbacks shown on the sheets. When a plan set already anticipates what the plan checker will flag, review time shrinks and the build quote holds.

When a Marina del Rey Homeowner Needs This

A homeowner needs ADU plans the moment they’re considering a detached structure on fill soil or any footprint change that touches coastal review. Waiting until the permit counter to discover the geotech requirement is the single most expensive mistake we see repeated.

What We Include

Every plan set we commission includes the site plan with coastal-zone notations, foundation details engineered for the liquefaction designation, and a fastener and lath schedule specific to salt-air exposure. No generic details copied from an inland template.

ADU Contractor in Marina del Rey

The living room inside a new ADU

An ADU Contractor in Marina del Rey has to be more than a general builder. They need to understand what the county’s plan checkers ask for on fill soil, which triggers a Coastal Development Permit, and how to sequence a build so the marine layer doesn’t sit on exposed framing for weeks. We act as the contractor of record, coordinating geotech, structural engineering, the prefab manufacturer or framing crew, and county inspections as one job. A standard garage conversion to a JADU in Marina del Rey generally runs $110,000 – $180,000. A detached one-bedroom ADU on a fill-soil parcel typically lands between $225,000 – $350,000, including the geotech, engineered foundation, and marine-grade finishes that inland bids omit.

We write every allowance into the contract before work begins. When a wall opens and we find what’s behind it (corroded lath, cloth wiring, rotted sills), the price to fix it was already a line item you approved. Nothing changes at the door. That’s The Kingswell Way: say the price before the work, show up in the window given, leave the place cleaner than found, put the guarantee in writing, come back if it fails.

Working With Prefab Manufacturers

We act as the installing contractor for projects specified through ADU Builders team members who match homeowners with prefab systems. We have hands-on time with Cover, Dvele, and Boxabl units, and we know how each manufacturer’s envelope details hold up in Marina del Rey’s salt air. When a prefab spec calls for standard galvanized hardware, we flag it and upgrade before install.

Garage Conversions and JADUs

On the rare single-family parcels along Via Marina and in the county pockets west of Lincoln Boulevard, garage conversions and JADUs dominate. These projects are smaller in scope but not simpler: the county code triggers once we open walls, and the marine layer has usually done more damage than a homeowner expects.

Trusted Brands We Service in Marina del Rey

We work regularly with Cover, Dvele, and Boxabl, and we stock marine-grade hardware and fasteners locally for Marina del Rey jobs. That means when the plan checker requires a hot-dip galvanized anchor schedule or a stainless fastener upgrade, we’re not waiting on a backorder from an inland supplier. We know these systems’ connection details and we know which of them hold their air seal against persistent salt exposure. The local pros have built with these manufacturers’ components on fill-soil sites across the community. When a homeowner wants a specific brand, we already know its plan-check path through the county. Call (254) 602-5618 and we’ll tell you honestly which brand fits your lot and budget.

Common ADU Problems We See in Marina del Rey Homes

  • Quoting a slab-on-grade foundation before the geotech comes back. Marina del Rey sits on dredged fill and former Ballona Creek wetlands with a high liquefaction-hazard designation. The county routinely requires a site-specific geotechnical report and engineered foundation, and an inland quote that skips this is underpriced by $5,000 – $15,000 before any work starts.
  • Specifying standard zinc-plated fasteners and non-marine lath. The persistent marine layer and salt-laden onshore air in Marina del Rey corrode standard zinc hardware within a few years. We specify hot-dip galvanized or stainless from the first material order, not after an inspection failure.
  • Treating a Marina del Rey condo or garden-apartment parcel like a Culver City single-family lot. The housing stock here, built in the 1960s through 1980s, is dominated by mid-rise condos and garden apartments with almost no detached single-family lots. HOA governance and coastal review restrict what actually gets built, and a bid that ignores that reality dies at the permit counter.
  • Opening walls on a 1960s structure without an inspection-first protocol. What we find when we open a Marina del Rey wall, cloth-wrapped wiring, rotted sill plates, corroded stucco wire lath, often triggers county code upgrades. We write those upgrades as line-item allowances in the contract so the price move is visible and approved in writing before any repair work begins.

Pricing for ADU Builders in Marina del Rey, CA

Real numbers, in writing, before you commit. A Junior ADU or garage conversion in Marina del Rey typically runs $110,000 – $180,000. A detached one-bedroom ADU on a fill-soil parcel runs $225,000 – $350,000, including geotech, engineered foundation, marine-grade finishes, and the county’s two-layer review. A studio ADU inside an existing structure or as a prefab module lands between $85,000 – $160,000. The spread depends on whether a Coastal Development Permit is triggered, what the geotech report says, and whether the existing structure requires electrical or framing upgrades once walls open. We give you the full written price before any work begins, with no price changes at the door. Call (254) 602-5618 for a free estimate and a written number.

On that rare single-family parcel off Via Marina, the local pro opened the back wall of a 1963 garden-apartment conversion and found cloth-wrapped wiring feeding a converted garage, rotted sill plates on the original framing, and stucco wire lath corroded through by the marine layer. The county’s plan checker flagged it all as triggering current electrical and framing code. We pulled a site-specific geotechnical report first because of the fill soil’s liquefaction designation, wrote the geotech, foundation upgrade, and re-wire as line-item allowances in the contract, and got written approval for the sill-plate replacement before ordering a single hot-dip galvanized fastener. That’s how a Marina del Rey ADU quote should work.

We Also Serve Cities Near Marina del Rey

While this page speaks to homeowners in Marina del Rey and the coastal-zone parcels we serve here, our team also builds in Venice, Culver City, Santa Monica, and El Segundo. Each of those communities has different permit paths and soil conditions, so this page is specific to Marina del Rey, and a Culver City quote won’t carry the same geotech and coastal assumptions. If you’re in one of those nearby cities or still deciding where your project lands, see our main ADU Builders in Marina del Rey page for the local detail and give us a call at (254) 602-5618.

Serving Marina del Rey, CA - Our Local Coverage Area

We’re serving the Marina del Rey area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs About ADU Builders in Marina del Rey

Why Marina del Rey Chooses Lodgewick ADU Builders

We set the standard for ADU builders in Marina del Rey.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Marina del Rey

Getting your ADU builders project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU builders project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU builders pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Marina del Rey Customers Say

Trusted by homeowners across Marina del Rey and surrounding areas.

★★★★★

"I was nervous about adding on but they walked me through every step and every cost before we started. No surprise change orders halfway through like I'd heard horror stories about."

Eleanor Pratt
★★★★★

"Junior ADU conversion inside the house. They protected the rest of our place with plastic and daily cleanup. Done nearly on schedule and on the number they quoted."

Sabrina Veld
★★★★★

"Garage conversion into an office and guest room. Fair written price, finished close to on schedule, and they fixed a small drywall crack under warranty months later without any hassle."

Diana Cho

More ADU services in Marina del Rey

Every build below starts the same way: a free site visit and a written price.

Getting started with Lodgewick

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Find your local team

Each location is independently owned and works to the same written standard. Enter your ZIP code to reach yours.

A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Mar 31, 2027
Always

Written Price Before Any Work Starts

Expires Mar 31, 2027
Included

Written Guarantee on Every Repair

Expires Mar 31, 2027
Free

Free Second Visit if the Repair Fails

Expires Mar 31, 2027

Ready for ADU Builders in Marina del Rey?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Marina del Rey.

(254) 602-5618

Request a Free Estimate in Marina del Rey

Tell us about your ADU builders needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Areas We Serve
Call Now - 24/7 Dispatch