A free site visit, a check of what your lot allows and a written, line-item price.
Get your free estimateADU Company in Crestline, CA
Building an ADU in Crestline is a different animal than building one down the hill. At 4,500 to 5,000 feet, a second unit has to handle snow loads, fire-hardening codes, and mountain terrain that flatland builders never contend with. Most Crestline homes are 1940s to 1970s cabins and A-frames with undersized panels and post-and-pier foundations, so nearly every project starts with whole-house upgrades before the ADU itself gets permitted. We handle that reality from day one, and we put a written price in your hand before any work begins. Call (254) 602-5618 to talk through your lot and what’s actually possible up here.
Why Crestline Homes Are Different

Crestline sits in a Very High Fire Hazard Severity Zone, which means every new structure has to meet California Building Code Chapter 7A: ignition-resistant siding, ember-proof vents, tempered glass in certain exposures, and defensible-space-compatible detailing. That’s table stakes up here, but a valley contractor doing their first mountain job often misses it until plan check sends the drawings back. We see it regularly with homeowners who started a project with someone else and stalled at the county.
The bigger hurdle is usually the septic system. Crestline has no sewer mains to speak of – homes rely on private septic systems, and San Bernardino County requires capacity testing before approving a second dwelling unit on the property. If the perc test fails or the tank is from the 1960s, you’re looking at a system upgrade before the ADU is ever on the table. That’s a five-figure item most online ADU cost calculators never mention.
Then there’s the structure itself. The original cabins around Crestline were summer cottages, not year-round homes. We routinely open up walls and find 2×4 rafters that were never engineered for the snow load San Bernardino County now requires. Add in steep hillside lots with clay-over-granite soils and freeze-thaw heave, and you understand why slab-on-grade designs need a geotechnical look before they’re drawn. None of this makes an ADU impossible in Crestline – it just means the planning phase has to be honest about what the mountain demands.
Our Main Crestline Services
Most Crestline homeowners come to us through one of three doors: they need more room and don’t want to move, they’ve got a garage that’s dead space, or they want a fully separate unit for family or rental income. Each path has its own Crestline page with local pricing and specifics.
Home Addition Contractor in Crestline
A home addition in Crestline means tying new square footage into a 1960s or 1970s cabin without creating a structural mismatch. Snow loads on the new roof, frost-depth footings on the hillside, and fire-hardening on the new exterior all factor in from the first drawing. We handle the engineering and the county paperwork, not just the framing. Home Addition Contractor in Crestline has the full breakdown of what additions cost up here.

Garage Conversion Contractor in Crestline
Converting a garage in Crestline almost always means upgrading what’s already there. Old garages here were built for cars and tools, not living space: no insulation, slab floors with no vapor barrier, and electrical panels that can’t carry a kitchen or a bathroom. We bring the space up to code, harden the exterior, and handle the septic question if you’re adding plumbing. See Garage Conversion Contractor in Crestline for local cost ranges and what a conversion involves start to finish.

ADU Builders in Crestline
A detached ADU in Crestline has to work with the lot, not against it. We’re familiar with prefab systems from Cover and Mighty Buildings that handle snow load and fire code well, and we pair them with site work that accounts for hillside drainage and septic capacity. The result is a permitted second dwelling that’s actually buildable on your specific parcel, not a stock plan that falls apart at plan check. ADU Builders in Crestline covers detached unit pricing and the prefab-versus-stick-built decision.

Brands We Service in Crestline
We work regularly with prefab and panelized systems from Cover, Dvele, and Boxabl – each has strengths for mountain lots, and we match the system to your parcel rather than forcing a square peg. For local parts availability, see our brands page. Turnaround on prefab orders is typically four to eight weeks once drawings are approved.
Pricing for ADU Company in Crestline, CA
| Service | Typical range in Crestline |
|---|---|
| Detached ADU, 400 – 600 sq ft (prefab) | $180,000 – $260,000 |
| Detached ADU, 600 – 900 sq ft (stick-built) | $240,000 – $340,000 |
| Garage conversion, 400 sq ft (studio) | $120,000 – $165,000 |
| Garage conversion, 500 – 600 sq ft (1-bed) | $150,000 – $200,000 |
| Home addition, 400 – 600 sq ft | $160,000 – $230,000 |
| Home addition, 600 – 900 sq ft | $220,000 – $310,000 |
| Septic system replacement or upgrade | $15,000 – $35,000 |
| Electrical panel upgrade, 60 – 100 amp to 200 amp | $3,500 – $6,500 |
| Foundation reinforcement (post-and-pier) | $8,000 – $25,000 |
| Fire-hardening retrofit on existing structure | $10,000 – $30,000 |
What pushes Crestline prices up is the mountain itself: septic capacity work, snow-load engineering, fire-hardening materials, and inspectors who schedule mountain runs on limited days. Every Lodgewick project starts with a written price before work begins, and that number doesn’t change at the door.
Neighborhoods We Serve in Crestline
We work across the Crestline area, from the lake side of town to the upper benches where lots get steeper and access gets tighter. Crestline’s two main ZIPs, 92325 and 92322, cover most of what we do. Our response time for an estimate visit is typically within three to five business days, depending on whether we’re coordinating with a county inspection day.
- Lake Gregory area
- Skyland
- Valley of Enchantment
- Rim of the World / Highway 138 corridor
- Dart Canyon
Service Area – Cities Near Crestline
While this page focuses on Crestline, the local pros also work in the surrounding mountain and valley communities. If you’re in Lake Arrowhead, CA, Highland, CA, San Bernardino, CA, or Rialto, CA, each of those pages covers local conditions and pricing for that area.
Serving Crestline, CA - Our Local Coverage Area
We’re serving the Crestline area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs About ADU Company in Crestline

Plan on design and permitting taking four to eight months before groundbreaking, with county inspection scheduling adding the biggest variable. We start with a lot walk and a written scope, then move into drawings and county submittal. The mountain inspection calendar is what it is, but we plan around it from day one.
Usually, yes. San Bernardino County requires septic capacity testing before approving a second unit, and systems from the 1960s or 1970s often fail. Budget $15,000 to $35,000 for a replacement if yours is undersized. We arrange the testing early so you know the real cost before design is locked.
Yes. Permits route through San Bernardino County Land Use Services, not a local city hall, and we prepare and submit the full package, coordinate with inspectors on their mountain-run days, and keep you posted at each step. You’re not chasing paperwork alone.
That’s the most common first question we hear in Crestline, and it’s exactly what the free estimate is for. We walk your lot, check the septic and panel situation, and give you honest numbers on all three paths so you can decide with real data. Call (254) 602-5618 to schedule it.
What happens when you call
- 1A real person answersNo phone trees. Talk to a local ADU pro.
- 2You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
- 3We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
- 4You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.
What Crestline Customers Say
"I was nervous about adding on but they walked me through every step and every cost before we started. No surprise change orders halfway through like I'd heard horror stories about."
- Eleanor Pratt"Junior ADU conversion inside the house. They protected the rest of our place with plastic and daily cleanup. Done nearly on schedule and on the number they quoted."
- Sabrina Veld"Garage conversion into an office and guest room. Fair written price, finished close to on schedule, and they fixed a small drywall crack under warranty months later without any hassle."
- Diana Cho