ADU Company in Cypress, CA
Cypress homeowners call Lodgewick ADU Builders when they want a straight answer about adding an accessory dwelling unit (ADU) – a separate living space on their existing lot. Most Cypress homes are single-story ranchers built between 1962 and 1978, and the biggest question isn’t usually whether an ADU will fit, but whether the setback math works before spending money on design. We serve Cypress with written pricing before work starts, and a live person answers when you call (254) 602-5618.
Why Cypress Homes Are Different
Cypress grew up fast. Almost the entire city was built out between the early 1960s and late 1970s as planned single-family tract development. That left Cypress with block after block of stucco ranch homes on concrete slabs, most sitting on lots between 6,500 and 8,000 square feet. It sounds like plenty of room, but California’s ADU setback rules – 4 feet from rear and side property lines – mean those lots constantly ride the edge of what’s buildable. A lot that looks wide open on a satellite photo can lose most of its buildable backyard once the survey comes back and you subtract the existing garage footprint.
The attached garages on these homes are the other Cypress story. Most were built with 7.5-foot ceilings and no vapor barrier under the slab. That matters because garage conversions are the most common ADU path in Cypress, and they frequently need ceiling height adjustments plus moisture remediation before the space meets habitable standards. Cypress sits in the flat northwestern Orange County basin, where marine layer moderates summer heat but traps overnight humidity. A converted garage without proper ventilation or mechanical cooling will feel damp within the first month. We plan for that from the start.
Our Main Cypress Services
Cypress homeowners most often ask us about two paths: converting what they already have, or building something new. Here are the services we handle across the city.
Home Addition Contractor in Cypress
Adding square footage to a Cypress ranch – whether it’s extending a bedroom wing, adding a family room, or building out on the slab – means working with stucco exteriors, post-and-beam framing common to 1960s tract construction, and flat lot drainage that has nowhere to go but into the neighbor’s yard if not planned properly. We make sure the roofline ties in correctly to the existing single-story structure and that the foundation addition is engineered for Orange County’s clay-heavy soil. Every project starts with a written price and a survey, because on Cypress lots, six inches makes the difference between a smooth permit and a redesign. Home Addition Contractor in Cypress

Garage Conversion Contractor in Cypress
Garage conversions in Cypress are usually the fastest route to a rentable or in-law space, and they come with a Cypress-specific advantage: most attached garages on these tract homes sit 5 to 6 feet from the rear property line, just inside the older setback rules, which means converting the garage avoids the rear-setback fight entirely. The catch is the ceiling height and the missing vapor barrier under the slab. We handle both, bringing the space up to habitable standards before finish work begins. Garage Conversion Contractor in Cypress

ADU Builders in Cypress
For a detached ADU in Cypress – a standalone small house in the backyard – the real work happens before the first permit is pulled. We survey the lot, map the setbacks, and confirm what the existing garage already consumes of the rear-yard buildable area. On Cypress’s 6,500 to 8,000 square foot lots, that math frequently pushes owners toward a compact footprint or a prefab design from Abodu or Cover, which can be sited faster than stick-built. If a detached unit won’t fit, we’ll tell you before you spend a dime on design. ADU Builders in Cypress

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Brands We Service in Cypress
We work with leading ADU and building-material brands including our brands Abodu, Cover, and James Hardie. When a Cypress homeowner wants a prefab unit, we handle site prep, foundation, utilities, and finish-out. For stick-built additions and garage conversions, we specify James Hardie siding where exterior durability against coastal humidity matters.
Pricing for ADU Company in Cypress, CA
| Service | Typical range in Cypress |
|---|---|
| Garage conversion (attached, basic finish) | $90,000 – $140,000 |
| Garage conversion (with ceiling height and slab moisture work) | $120,000 – $170,000 |
| Detached ADU (prefab, 400-600 sq ft) | $180,000 – $260,000 |
| Detached ADU (stick-built, 1-bedroom) | $220,000 – $310,000 |
| Detached ADU (stick-built, 2-bedroom) | $280,000 – $380,000 |
| JADU (junior ADU within existing home footprint) | $80,000 – $120,000 |
| Home addition (single room, slab-on-grade) | $110,000 – $160,000 |
| Home addition (primary suite or family room) | $150,000 – $230,000 |
Cypress prices skew upward when slab moisture remediation or ceiling height modifications are needed – both common on 1960s garage conversions – and when the survey shows a detached ADU must shrink to fit setback rules. Before any work starts, you get a written price that does not change at the door.
Neighborhoods We Serve in Cypress
We work all across Cypress, from the neighborhoods around Cypress College to the tracts south of Lincoln Avenue and west of Valley View Street. Most of the housing stock is the same 1962-1978 ranch construction, which means our crews know what they’re opening up before they open it.
- College Park
- Cypress Village
- Garden Park
- Los Alamitos Tract
- South Cypress
Service Area – Cities Near Cypress
Lodgewick ADU Builders serves Cypress and the surrounding Orange County and northwest Los Angeles County communities. If you’re in a neighboring city, we cover La Palma, CA, Los Alamitos, CA, Hawaiian Gardens, CA, and Buena Park, CA with the same written-price guarantee on every ADU, conversion, and addition.
Serving Cypress, CA - Our Local Coverage Area
We’re based in the Cypress area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs About ADU Company in Cypress
Most Cypress projects can begin within two to four weeks after you approve the written proposal. Site surveys and permit preparation take the longest, especially when setbacks need verification. Call (254) 602-5618 and we’ll give you a realistic timeline for your specific lot.
Some Cypress tract subdivisions have HOAs with older covenants that predate California’s ADU-friendly state laws. State law overrides most ADU prohibitions, but HOA architectural review can still delay approval. We handle the paperwork and help you understand what applies to your neighborhood before design begins.
We serve the entire city of Cypress, including all residential neighborhoods north and south of Lincoln Avenue. Scheduling is coordinated from our Los Angeles office with local crews serving Cypress directly. Call (254) 602-5618 to confirm your address and schedule a free estimate.
What happens when you call
- 1A real person answersNo phone trees - talk to a local adu pro.
- 2You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
- 3We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
- 4You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.
What Cypress Customers Say
"Junior ADU conversion inside the house. They protected the rest of our place with plastic and daily cleanup. Done nearly on schedule and on the number they quoted."
- Sabrina Veld"Garage conversion into an office and guest room. Fair written price, finished close to on schedule, and they fixed a small drywall crack under warranty months later without any hassle."
- Diana Cho"The ADU came out beautiful and the permitting, which terrified me, was handled start to finish. They kept me updated every week so I was never wondering what was happening."
- Shauna Mills